The following is a guide to some of the standards in relation to the activity being performed on tower sites. Mr. Tom Pontuti with the Cleveland, Ohio office of OSHA assisted Don Doty, OSHA Relations Committee Chairman in compiling this list.
Site Preparation Including roads, site clearance, staging area, temporary electrical, pre-planning power lines and pre-planning gas lines: |
Heavy Equipment/Struck By-1926.20
|
Heavy Equipment/Struck By-1926.21
|
Rollovers/Caught Between- 1926.601
|
Rollovers/Caught Between- 1926.602
|
Electrocution/Power Lines- 1926.20
|
Flammables/Hazardous- 1926.150 - 152
|
Flammables/Hazardous- 1926.150 - 152
|
Flammables/Hazardous- 1926.150 - 152
|
Flammables/Hazardous- 1926.55
|
Blasting- 1926.900 - 904
|
Blasting- 1926.900 - 904
|
Blasting- 1926.900 - 904
|
Blasting- 1926.900 - 904
|
Blasting- 1926.900 - 904
|
Logging/Chain Saw/Treefelling 1926.604
|
Logging/Chain Saw/Treefelling- 1926.302
|
Vermin/Insects/Snakes/Plants 1926.20(b)(4)
|
Sanitation- 1926.51
|
Emergency Medical/First Aid- 1926.50
|
Emergency Medical/First Aid- 1926.23 & 20
|
Emergency Medical/First Aid- 1926.23 & 20
|
Traffic Control- 1926.201
|
PPE- 1926.95 & 100
|
PPE- 1926.95 & 100
|
|
Foundations Including excavation/trenching, piers, piling, caisson. pouring concrete, framing and rebar:
|
Cave In/Crushing/Water/Falling In- 1926.652
|
Caught Between/Crane Radius- 1926.550
|
Struck By/Concrete- 1926.700-702
|
Struck By/Concrete- 1926.700-702
|
Struck By/Concrete- 1926.700-702
|
|
Erection Including material handling, unloading steel, rigging, assembling sections, erection, gin poles, climbing/accessing tower, back bolting, and cleanup:
|
Material Handling/Rigging/Struck By/Caught Between- 1926.95, 96, 100-102
|
Material Handling/Rigging/Struck By/Caught Between- 1926.95, 96, 100-102
|
Material Handling/Rigging/Struck By/Caught Between- - 1926.95, 96, 100-102
|
Material Handling/Rigging/Struck By/Caught Between- - 1926.95, 96
|
Material Handling/Rigging/Struck By/Caught Between- 1926.250-251
|
Material Handling/Rigging/Struck By/Caught Between- 1926.250-251
|
Unsafe Erection / Tools Usage- 1926.301 & 302
|
Unsafe Erection / Tools Usage-1926.301 & 302
|
Ladder Usage- 1926.1053
|
Lift Trucks- 1026.6025(a)(1) General Duty Clause
|
Lift Trucks- - 5(a)(1) General Duty Clause
|
Climbing/Point-to-Point- 5(a)(1), General Duty Clause
|
Hook, Load & Load Line- 1926.522 (17) 1926.550 (g)
|
Hook, Load & Load Line- 1926.453
|
Cranes & Gin Poles/Hazards/Overloads/No Inspections- 1926.105
|
Cranes & Gin Poles/Hazards/Overloads/No Inspections- 1926.95
|
Cranes & Gin Poles/Hazards/Overloads/No Inspections- 1926.104
|
Cranes & Gin Poles/Hazards/Overloads/No Inspections- 1926.753
|
Collapse/Equipment Failure- 1926.251
|
Hoisting Personnel- ANSI B30.7
|
Hoisting Personnel- CPL 2-1_29
|